HOLYOKE- IMPROVEMENTS TO LOWER WESTFIELD ROAD ON I-91 (INTERCHANGE 15)
Following the Road Safety Audit this project is expected to include new pavement markings and signage, and signal timing and equipment upgraded. The roadway will be widened to accommodate bicyclists and sidewalks will be included where possible.
Location:
  • City of Holyoke
  • Construction Begins: Spring 2018
    Resident Engineer: Mark Joy
    Construction Bid Price: $1,960,508.65
    District: District 2

    Contracts (2) Progress
    # 102197 -- Construction Contract
    Roadway Reconstruction and Related Work (Including Signals) along a Section of Lower Westfield Road including Ramp Realignment at I-91, Interchange 15 Completed
    # 65756 -- Design -- Geotechnical
    Work will consist of Geotechnical Review during the design of bridge structures and/or roadways owned by MassDOT and Cities and Towns throughout the Commonwealth. Final

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 04/02/2018
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Other types not listed
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/20/2012
    Project Initiation Form PIF Entered 03/20/2012
    Project Initiation Form PRC Submitted 03/20/2012
    Project Review Committee PRC Approved 03/22/2012
    Project Status Advertised 09/09/2017
    Project Management
    100% Design 100% Package Received 06/19/2017
    100% Design 100% Package Comments to DE 07/10/2017
    25% Design 25% Package Received 12/19/2016
    75% Design 75% Package Received 12/19/2016
    Final Design PS&E Received 08/04/2017
    Final Design PS&E to FAPRO 08/28/2017