Project Description: |
STATEWIDE- REPLACEMENT OF VARIABLE MESSAGE SIGNS (VMS)
Replacement of non-operational permanent overhead Variable Message Signs at various locations statewide.
|
Location: | |
Construction Begins: | Winter 2016/2017 |
Resident Engineer: | Derek Coble |
Construction Bid Price: | $2,883,117.00 |
District: | District 6 |
|
Bridges |
|
|
|
|