Project Description: |
BOSTON- BRIDGE MAINTENANCE, B-16-600 (9PM), I-93 RAMP SA-CN OVER CHARLES RIVER (LEONARD P. ZAKIM BUNKER HILL MEMORIAL)
Project scope includes cleaning bridge deck, joints and other components as well as removing vegetation and various concrete repairs. Also the repair of deck joints, clean and paint facia girders, overcoating bearings and cables as well as maintaning the windtie system and determining deck profile.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Summer 2027 |
Project Manager: | Alyson Bedard |
Estimated Total Contract Cost: | $34,500,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | Peer Review Comments to DE (as of 06/21/2016 ) |
|
Bridges
|
|
|
|