| Project Description: |
BOSTON- LEAK SEALING, FIREPROOFING & MISCELLANEOUS REPAIRS IN I-93, TIP O'NEILL TUNNEL (CRC 1E)
I-93 Tunnel ceiling leak, fireproofing and miscellaneous repairs.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Steven E McLaughlin![]() |
| Estimated Total Contract Cost: | $12,491,893.75 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|