Project Description: |
DUDLEY- BRIDGE DEMOLITION, D-12-009, CARPENTER ROAD OVER QUINNEBAUG RAIL TRAIL
This timber bridge is a structurally deficient DOT Ch 634 bridge with an AASHTO = 16.2 and is posted for 6 tons. The bridge will be demolished and an at-grade pedestrian crossing will be constructed for the rail trail users.
|
Location: |
|
Construction Begins: | Spring 2017 |
Resident Engineer: | Peter Kurt |
Construction Bid Price: | $413,113.70 |
District: | District 3 |
|