Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
CHELMSFORD- BRIDGE SUPERSTRUCTURE REPLACEMENT, C-08-048 (2LP), HUNT ROAD OVER I-495
The existing structure, five continuous spans, was constructed in 1961. The superstructure consists of 7 rolled beams with a reinforced concrete deck and bituminous concrete wearing surface. The substructure consists of pile supported reinforced concrete stub type abutments, pile supported concrete gravity type wingwalls, and reinforced concrete column bent type piers supported on spread footings. From the SI&A, the overall structure length is approximately 296.5 feet, the out-to-out deck width is 49.5 feet. As measured, the curb-to-curb roadway width is 40 feet, the east sidewalk width is 5 feet, and the west sidewalk is 2.6 feet. The bridge is structurally deficient but not functionally obsolete. The new superstructure shall be designed using the 2012 AASHTO LRFD Bridge Design Specifications, 6th Edition with current interim revisions for HL-93 loading and, where appropriate, the new MassDOT 2013 LRFD Bridge Manual. Upon verification of the adequacy of the existing substructure, the consultant shall investigate either superstructure replacement with new weathering steel stringers composite with a reinforced concrete deck or deck replacement and clean and paint the existing beams. Substructure elements shall be repaired as required, and approximately 100 feet of the approach roadways shall be reconstructed as necessary. The proposed work includes, a full replacement of the existing steel stringers with new weathering steel stringers, deck replacement, replacement of all existing bolsters and bearings, modifications of the existing abutment backwalls, bridge seats, and pier caps as required. Bridge railing shall be CP-PL2 with Protective Screen Type II. A preliminary rating shall be included in the design calculations as a quality assurance check.
Location:
  • Town of Chelmsford
  • Resident Engineer: Vincent DeAngelo
    Construction Bid Price: $5,228,997.70
    District: District 4

    Contracts (3) Progress
    # 55041 -- Design -- Bridge Rehab/Recon/New Const
    Work will consist of structural evaluations and emergency design support services to support the Bridge Preservation/Betterment Advertisement Program. Final
    # 71613 -- Design -- Bridge Open End
    Work will consist of providing engineering design services to MassDOT on a task order basis for bridge, traffic and utility permit structural design and analysis assignments. Final
    # 90470 -- Construction Contract
    Bridge Superstructure Replacement Br. No. C-08-048 (Steel) Hunt Road over Interstate 495 Completed

    Bridges

    Contract Dates
    Notice to Proceed: 03/10/2016
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 04/06/2012
    Project Initiation Form PIF Entered 04/06/2012
    Project Initiation Form PRC Submitted 07/19/2013
    Project Review Committee PRC Approved 07/25/2013
    Project Status Advertised 09/05/2015
    Project Management
    100% Design 100% Package Received 07/27/2015
    25% Design 25% Package Received 05/19/2014
    25% Design 25% Package Comments to DE 04/03/2015
    25% Design Design Public Hearing 04/09/2015
    75% Design 75% Package Received 05/11/2015
    75% Design 75% Package Comments to DE 06/23/2015
    75% Design 75% Plans Approved 07/24/2015
    Final Design PS&E Received 09/01/2015
    Final Design PS&E to FAPRO 09/01/2015
    Consultant Contract Process Scope to DE 11/08/2013