| Project Description: |
HUBBARDSTON- BRIDGE REPLACEMENT, H-24-009, EVERGREEN ROAD OVER MASON BROOK
This municipally owned structure is structurally deficient with an AASHTO = 43.4. The inspection rating is 6-4-5. It is proposed to replace the entire structure.
|
| Location: |
|
| Construction Begins: | Spring 2020 |
| Resident Engineer: | Peter Kurt![]() |
| Construction Bid Price: | $1,732,191.00 |
| District: | District 3 |
|
Bridges
|
||||||||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||