| Project Description: |
PLYMOUTH- RESURFACING & RELATED WORK ON ROUTE 3
The project will resurface Route 3 in Plymouth from Milepoint 7.8 to 16.3 for a project length of 8.5 miles.
|
| Location: |
|
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Eamon Kernan![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||