| Project Description: |
SHREWSBURY- NORTHBOROUGH- WESTBOROUGH- RESURFACING AND RELATED WORK ON ROUTE 9
This project consists of resurfacing Route 9 in Shrewsbury, Northborough and Westborough from mile marker 100.3 to mile marker 107.0 for a total length of 6.7 miles.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Lyris Liautaud![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||