EASTON- CORRIDOR IMPROVEMENTS ON DEPOT STREET (ROUTE 123), FROM NEWELL CIRCLE TO WASHINGTON STREET (ROUTE 138)
This project is intended to address deteriorated pavement and multi-modal accommodation through reconstruction of the roadway (minor widening) to provide bicycle accommodation in addition to reconstructed sidewalks and extensions. The project is 2 miles in length. A traffic signal is proposed at the Depot Street/Center Street/Porter Street intersection. The project also includes drainage upgrades and new pavements markings and signs.
|