Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
EASTON- CORRIDOR IMPROVEMENTS ON DEPOT STREET (ROUTE 123), FROM NEWELL CIRCLE TO WASHINGTON STREET (ROUTE 138)
This project is intended to address deteriorated pavement and multi-modal accommodation through reconstruction of the roadway (minor widening) to provide bicycle accommodation in addition to reconstructed sidewalks and extensions. The project is 2 miles in length. A traffic signal is proposed at the Depot Street/Center Street/Porter Street intersection. The project also includes drainage upgrades and new pavements markings and signs.
Location:
  • Town of Easton
  • Project Manager: Jonathan E Freeman
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project