| Project Description: |
ADAMS-CHESHIRE: BRIDGE REPAIRS ALONG THE ASHUWILTICOOK RAIL TRAIL (DCR P12-2769-D1A)
|
| Location: |
|
| Project Manager: | ![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 9 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||