Project Description: |
FRANKLIN- PEDESTRIAN BRIDGE CONSTRUCTION, F-08-005, OLD SR 140 OVER MBTA/CSX
Bridge F-08-005 is closed because Route 140 has been re-aligned. A new bridge has taken its place. This bridge is structurally deficient with an AASHTO = 15.5. It is proposed to demolish the old roadway bridge and replace it with a pedestrian bridge.
|
Location: |
|
Resident Engineer: | Anthony Tavalone |
Construction Bid Price: | $1,199,465.15 |
District: | District 3 |
|
Bridges
|
|
|
|
|