Project Description:
BOSTON- HYDRANT AND FIRE PROTECTION WATER MAIN REPLACEMENT ALONG A SECTION OF THE SOUTH BOSTON BYPASS ROAD AND I-93 FRONTAGE ROADS (CRC6)
Replacement of the fire water main system and hydrants serving the South Boston Bypass Road is necessitated due to corrosion of the existing C02A1-constructed infrastructure. The Frontage Road work is needed due to general deterioration due to the age of the existing system.
Location:
  • City of Boston
  • Construction Begins: Summer 2016
    Resident Engineer: Robert Tarquinio
    Construction Bid Price: $2,220,983.95
    District: District 6

    Contracts (3) Progress
    # 57463 -- Design -- Bridge Open End
    Work will consist of providing engineering design, review and construction management services on a task order basis. Final
    # 68386 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various statewide highway and bridge projects. Final
    # 93452 -- Construction Contract
    Hydrant and Fire Protection Water Main Replacement along a Section of the South Boston Bypass and I-93 Frontage Roads. (CRC 6) Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 07/06/2016
    Contract Information
    Project Designer: Consultant
    Funding Source: Metropolitan Highway System
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/23/2012
    Project Initiation Form PIF Entered 08/23/2012
    Project Initiation Form PRC Submitted 09/05/2012
    Project Review Committee PRC Approved 11/15/2012
    Project Status Advertised 03/05/2016
    Project Management
    100% Design 100% Package Received 02/01/2016
    25% Design 25% Package Received 06/05/2015
    25% Design 25% Package Comments to DE 09/04/2015
    25% Design 25% Package Approved 12/11/2015
    Final Design PS&E Received 02/26/2016
    Final Design PS&E Received 03/28/2016
    Final Design PS&E to FAPRO 03/01/2016
    Final Design PS&E to FAPRO 04/08/2016