Project Description:
ATHOL- PHILLIPSTON- MEDIAN DELINEATOR REPLACEMENT ON ROUTE 2, FROM SOUTH ATHOL ROAD TO 1,330 FT. WEST OF STATE ROAD (6 MILES)
A previous Route 2 Safety Project (602943) widened the roadway and installed delineators on the new quick-curb median area (advertised in 2004). This project would replace all the reflectorized delineator panels in the Qwick-curb safety median on a six mile section of Route 2 that was constructed originally in 2006-2007, and are becoming worn, cracked, faded, and otherwise deteriorated and require replacement.
Location:
  • Town of Athol
  • Town of Phillipston
  • Resident Engineer: Steven Doyle
    Construction Contract Value: $588,376.00
    Construction Bid Price: $510,160.00
    Initial Construction Estimate: $535,134.00
    District: District 2

    Contracts (1) Progress
    # 80249 -- Construction Contract
    Median Delinaeator Replacement along a Section of Route 2. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 05/23/2014
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/28/2012
    Project Initiation Form PIF Entered 08/28/2012
    Project Initiation Form PRC Submitted 11/06/2012
    Project Review Committee PRC Approved 11/15/2012
    Project Status Advertised 10/19/2013
    Project Management
    100% Design 100% Package Received 05/20/2013
    25% Design 25% Package Received 03/15/2013
    75% Design 75% Package Received 03/15/2013
    Final Design PS&E Received 05/20/2013
    Final Design PS&E to FAPRO 09/09/2013