Project Description: |
DISTRICT 4- DISTRICT 6- SIGNS & MARKING UPGRADES FOR STOP-SIGN CONTROLLED INTERSECTIONS AT VARIOUS LOCATIONS
FHWA identified systematic low cost fixes at stop-controlled intersections as a means to dramatically reduce crashes. There are 26 communities with a total of 102 intersections.
|
Location: | |
Resident Engineer: | Ayobami Akinade |
Construction Contract Value: | $277,103.00 |
Construction Bid Price: | $219,639.58 |
Initial Construction Estimate: | $318,664.50 |
District: | District 4 |
|