| Project Description: |
DISTRICT 5- SIGNS & MARKING UPGRADES FOR STOP-SIGN CONTROLLED INTERSECTIONS AT VARIOUS LOCATIONS
FHWA identified systematic low cost fixes at stop-controlled intersections as a means to dramatically reduce crashes. There are 27 communities with a total of 79 intersections.
|
| Location: | |
| Resident Engineer: | Daniel Vieira![]() |
| Construction Contract Value: | $208,081.00 |
| Construction Bid Price: | $164,892.06 |
| Initial Construction Estimate: | $238,371.00 |
| District: | District 5 |
|