Project Description:
READING- INTERSECTION SIGNALIZATION @ ROUTE 28 & HOPKINS STREET
The project will install traffic control signals at this high crash location and interconnect the new signals with the existing signals at Main Street and Summer Street and at Main Street and South Street. The project will also include construction of AAB/ADA compliant sidewalks and wheelchair ramps and geometric improvements.
Location:
  • Town of Reading
  • Construction Begins: Spring 2021
    Resident Engineer: Mai-Linh Dao
    Construction Bid Price: $1,571,014.25
    District: District 4

    Contracts (3) Progress
    # 101631 -- Design -- Bridge Open End
    Work will consist of providing engineering design and review services to MassDOT on an open end basis for various statewide and bridge projects, for the purpose of maintaining Final
    # 114312 -- Construction Contract
    Intersection Improvements and Related Work (Including Signals) along Sections of Route 28 (Main Street) at Hopkins Street, South Street, and Summer Avenue Completed
    # 64302 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 06/11/2021
    Contract Information
    Project Designer: Consultant
    Funding Source: FA - Surface Trans. Block Grant (STBG)
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/06/2012
    Project Initiation Form PIF Entered 09/13/2012
    Project Initiation Form PRC Submitted 09/13/2012
    Project Review Committee PRC Approved 11/15/2012
    Project Status Advertised 04/03/2021
    Project Management
    100% Design 100% Package Received 11/30/2018
    100% Design 100% Package Comments to DE 03/30/2018
    25% Design 25% Package Received 01/14/2014
    25% Design 25% Package Comments to DE 06/16/2014
    25% Design Design Public Hearing 07/08/2015
    75% Design 75% Package Received 11/30/2018
    Final Design PS&E Received 08/12/2020
    Final Design PS&E Received - Resub 1 09/30/2020