Project Description:
MASHPEE- CORRIDOR IMPROVEMENTS & RELATED WORK ON ROUTE 151, FROM OLD BARNSTABLE ROAD TO THE MASHPEE ROTARY (PHASE 1)
Work on this project will consist of corridor improvements on Route 151. Work will include intersection improvements, channelization, and potential exclusive left turn lanes at key driveways. In addition, traffic signals upgrading is required at key intersections such as Frank Ellis Drive/Job Fishing Rd. and Old Barnstable Rd. The project will address the lack of continuous 'complete streets' (bicycle and pedestrian accommodation) along the corridor, particularly at 2 key intersections: Frank Ellis Drive/Job Fishing Rd. and Old Barnstable Rd. Also, there is a need to update the crosswalks and pedestrian actuation equipment at the intersections to ADA compliance. Finally, signage, pavement markings and drainage need upgrading.
Location:
  • Town of Mashpee
  • Construction Begins: Autumn 2021
    Resident Engineer: Michelle Muller
    Construction Bid Price: $10,344,569.45
    District: District 5

    Contracts (1) Progress
    # 115043 -- Construction Contract
    Roadway Reconstruction and Related Work (Including Signals) on a Section of Route 151 (Nathan Ellis Highway) (Phase 1)

    Bridges

    Contract Dates
    Notice to Proceed: 10/26/2021
    Contract Information
    Project Designer: Municipality
    Funding Source: CONGESTION MIT. AIR QUAL.
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 10/05/2012
    Project Initiation Form PIF Entered 03/01/2013
    Project Initiation Form PRC Submitted 03/01/2013
    Project Review Committee PRC Approved 03/21/2013
    Project Status Advertised 07/03/2021
    Project Management
    100% Design 100% Package Received 10/02/2020
    100% Design 100% Package Comments to DE 11/16/2020
    25% Design 25% Package Received 11/16/2017
    25% Design 25% Package Comments to DE 06/05/2018
    25% Design 25% Package Received - Resub 1 12/04/2018
    25% Design 25% Package Received - Resub 2 04/03/2020
    25% Design Design Public Hearing 03/19/2019
    75% Design 75% Package Received 04/10/2020
    Final Design PS&E Received 03/29/2021
    Final Design PS&E Received - Resub 1 05/14/2021