| Project Description: |
TEMPLETON- RESURFACING & RELATED WORK ON A SECTION OF ROUTE 68, FROM THE GARDNER C.L. TO THE END OF STATE HIGHWAY
Project consists of milling and resurfacing a 2.0 mile section of State Road (Rte. 68) in the Town of Templeton. Also included will be sidewalk and wheelchair ramp reconstruction, reset granite curb, minor pavement widening, new pavement markings and new signage.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Lyris Liautaud![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||