| Project Description: |
GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER ANNISQUAM RIVER (PHASE II)
Remove and replace the existing arch level bracing with a more efficient structural tube system, perform arch structural repairs, clean and paint structural steel on arch level including braces, arches and columns.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Paul C. King![]() |
| Estimated Total Contract Cost: | $10,094,691.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|