| Project Description: |
GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER ANNISQUAM RIVER (PHASE II)
Remove and replace the existing arch level bracing with a more efficient structural tube system, perform arch structural repairs, clean and paint structural steel on arch level including braces, arches and columns.
|
| Location: |
|
| Resident Engineer: | Robert Bosy![]() |
| Construction Contract Value: | $10,094,691.00 |
| Construction Bid Price: | $9,062,447.00 |
| Initial Construction Estimate: | $12,055,630.00 |
| District: | District 4 |
|
Bridges
|
||||||||||||||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||