GLOUCESTER- BRIDGE PRESERVATION, G-05-017, ROUTE 128 OVER ANNISQUAM RIVER (PHASE II)
Remove and replace the existing arch level bracing with a more efficient structural tube system, perform arch structural repairs, clean and paint structural steel on arch level including braces, arches and columns.
Location:
  • City of Gloucester
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Paul C. King
    Estimated Total Contract Cost: $10,094,691.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 4
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • G05017 
    See the Milestone Details tab for additional Project information