NORTHAMPTON- DISTRICT ADMINISTRATION BUILDING SITE WORK
The work to be done shall include, but not be limited to; full-depth pavement around perimeter of new building footprint and at drainage trench locations as noted and/or directed by the Engineer, milling and overlay of existing paved site area and lots including North and South drive areas, line striping, and pavement marking placement, signage R&R, removal and relocation of chain link fence, granite curb, wheelchair ramp work, removal and replacement of existing handrails at the existing East entrance steps, patching and repair of all existing building - brick skin areas including, but not limited to brick and granite step surfaces, removal of existing shrubbery, bushes and other miscellaneous plantings, installation of proposed planting beds and appurtenances, loam and seeding.
Location:
  • City of Northampton
  • Resident Engineer: Anthony Kuralowicz
    Construction Contract Value: $1,148,708.48
    Construction Bid Price: $844,499.00
    Initial Construction Estimate: $657,976.50
    District: District 2

    Contracts (1) Progress
    # 82310 -- Construction Contract
    Resurfacing and Related Work at the District 2 Administration Building. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 07/25/2014
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/06/2012
    Project Initiation Form PIF Entered 11/06/2012
    Project Initiation Form PRC Submitted 11/06/2012
    Project Review Committee PRC Approved 11/15/2012
    Project Status Advertised 05/10/2014
    Project Management
    100% Design 100% Package Received 09/13/2013
    75% Design 75% Package Received 09/13/2013
    Final Design PS&E Received 04/25/2014
    Final Design PS&E to FAPRO 05/07/2014