| Project Description: |
DISTRICT 3- SCHEDULED & EMERGENCY BRIDGE DECK REPAIR ALONG I-90
scheduled routine repairs to bridge decks and joints, railing, curbs, riding surface, as well as emergency response repairs as needed.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Arthur Frost![]() |
| Estimated Total Contract Cost: | $1,600,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||||||||||||||||||||