| Project Description: |
DISTRICT 3- SCHEDULED & EMERGENCY SUBSTRUCTURE REPAIRS TO BRIDGES ALONG I-90
Scheduled routine maintenance of concrete abutments, backwalls, pier columns and caps. Emergency response as needed.
|
| Location: | |
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Arthur Frost![]() |
| Estimated Total Contract Cost: | $1,600,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|