LEXINGTON- RECONSTRUCTION ON MASSACHUSETTS AVENUE, FROM MARRETT ROAD TO PLEASANT STREET
The proposed project will address safety and capacity deficiencies at three intersections along Massachusetts Avenue; Marrett Road (Route 2A), Maple Street (Route 2A) and Pleasant Street (Routes 4/225). The improvements will be designed to be consistent with the principles of “complete streets” and will improve safety for pedestrians, bicyclists, and drivers. The project will also consolidate some uncontrolled mid-block crosswalks, improve transit (bus) operations and bus stops and provide bicycle accommodation along the roadway.
Location:
  • Town of Lexington
  • Construction Begins: Winter 2016/2017
    Resident Engineer: Brian Polley
    Construction Bid Price: $3,848,030.96
    District: District 4

    Contracts (1) Progress
    # 97770 -- Construction Contract
    Roadway Reconstruction and Related Work (Including Signals) along a Section of Route 4/225 (Massachusetts Avenue) and Adjacent Streets. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 02/23/2017
    Contract Information
    Project Designer: Municipality
    Funding Source: TAP
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 02/19/2013
    Project Initiation Form PIF Entered 02/19/2013
    Project Initiation Form PRC Submitted 03/04/2013
    Project Review Committee PRC Approved 03/21/2013
    Project Status Advertised 09/10/2016
    Project Management
    100% Design 100% Package Received 08/01/2016
    100% Design 100% Package Comments to DE 08/26/2016
    25% Design 25% Package Received 02/18/2014
    25% Design 25% Package Comments to DE 07/28/2014
    25% Design Design Public Hearing 05/07/2015
    75% Design 75% Package Received 04/25/2016
    75% Design 75% Package Comments to DE 05/27/2016
    Final Design PS&E Received 08/01/2016
    Final Design PS&E to FAPRO 09/06/2016
    Final Design PS&E Received - Resub 1 09/29/2016