| Project Description: |
DISTRICT 3- HOT MIX ASPHALT & BERM REPAIR AT VARIOUS LOCATIONS
THe work to be done includes the repair of asphalt surfaces by removing and replacing deteriorated sections of the existing pavement, of shoved and/or heaved asphalt.
|
| Location: | |
| Resident Engineer: | Raymond Tannar![]() |
| Construction Contract Value: | $918,324.15 |
| Construction Bid Price: | $873,324.15 |
| Initial Construction Estimate: | $877,650.00 |
| District: | District 3 |
|