WESTMINSTER- DECK REPLACEMENT, W-28-023, ROUTE 2A/140 OVER ROUTE 2
The project will include replacing the existing bridge deck. The bridge deck has been patched over a majority of it's surface area. The superstructure and substructure are in good condition.
|
| Location: |
|
| Resident Engineer: | Ryan Davison![]() |
| Construction Bid Price: | $2,672,775.00 |
| District: | District 3 |
|
Bridges
|
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||||||||||||||