Project Description: |
WESTMINSTER- DECK REPLACEMENT, W-28-023, ROUTE 2A/140 OVER ROUTE 2
The project will include replacing the existing bridge deck. The bridge deck has been patched over a majority of it's surface area. The superstructure and substructure are in good condition.
|
Location: |
|
Right of Way Responsibility: | MassDOT |
Project Manager: | Hercules L Kyriazidis![]() |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|