Project Description: |
WESTMINSTER- DECK REPLACEMENT, W-28-023, ROUTE 2A/140 OVER ROUTE 2
The project will include replacing the existing bridge deck. The bridge deck has been patched over a majority of it's surface area. The superstructure and substructure are in good condition.
|
Location: |
|
Resident Engineer: | Ryan Davison |
Construction Bid Price: | $2,672,775.00 |
District: | District 3 |
|
Bridges
|
|
|
|
|