| Project Description: |
NATICK- BRIDGE REPLACEMENT, N-03-012, BODEN LANE OVER CSX/MBTA
The project involves the replacement of Bridge # N-03-012 carrying Boden Lane over the MBTA Railroad. Also included are slope stabilization and retaining walls, multi-modal improvements, utility relocations, approach roadway reconstruction, and related work. The existing bridge is a temporary steel pedestrian structure that replaced a steel through truss dating back to 1891.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Construction Begins: | Winter 2026/2027 |
| Project Manager: | Christopher I Cameron![]() |
| Estimated Total Contract Cost: | $15,025,288.64 |
| Estimated Total Federal Participating Construction Cost: | $15,810,163.16 |
| Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
| District: | District 3 |
| Current Status: | PS&E Received - Resub 2 (as of 08/11/2026 ) |
|