SOUTHAMPTON- SAFE ROUTES TO SCHOOL (WILLIAM E. NORRIS ELEMENTARY)
The proposed pedestrian safety/access improvement project will include sidewalks on College Highway (Route 10) and Pomeroy Meadow Road, and improved connectivity between the Norris School and the residential neighborhoods to the south. The proposed improvements will also include upgraded wheelchair ramps, new pavement markings, new traffic and pedestrian warning signs, and some minor drainage modifications.
Location:
  • Town of Southampton
  • Construction Begins: Autumn 2016
    Resident Engineer: Paul Montero
    Construction Bid Price: $1,035,362.50
    District: District 2

    Contracts (2) Progress
    # 85766 -- Design -- Highway
    Work will consist of providing school assessments and preliminary and final engineering design and construction phase services to the Highway Engineering Division for the 2014 Final
    # 96620 -- Construction Contract
    Sidewalk Reconstruction and Related Work along a Section of Route 10 (College Highway) and Adjacent Streets (Safe Routes to School – William E. Norris School) Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 12/15/2016
    Contract Information
    Project Designer: Consultant
    Funding Source: TAP
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 03/19/2013
    Project Initiation Form PIF Entered 03/19/2013
    Project Initiation Form PRC Submitted 03/19/2013
    Project Review Committee PRC Approved 03/21/2013
    Project Status Advertised 07/30/2016
    Project Management
    100% Design 100% Package Received 11/13/2015
    100% Design 100% Package Comments to DE 01/08/2016
    25% Design 25% Package Received 05/22/2014
    25% Design Design Public Hearing 10/14/2015
    75% Design 75% Package Received 05/22/2014
    75% Design 75% Package Comments to DE 05/11/2015
    Final Design PS&E Received 02/22/2016
    Final Design PS&E to Peer Reviewer 02/25/2016
    Final Design Peer Review Comments to DE 06/16/2016
    Final Design PS&E to FAPRO 07/22/2016
    Final Design PS&E Received - Resub 1 06/16/2016
    Final Design PS&E Received - Resub 2 06/30/2016