Project Description: |
BURLINGTON- TYNGSBOROUGH- PAVEMENT PRESERVATION AT VARIOUS LOCATIONS ON ROUTE 3
This project will resurface Route 3 North in Burlington to Tyngsborough (MA/NH State Line) (SHRP2) from Mile post 72.0 to 91.5 a project length of 19.5 miles.
|
Location: |
|
Resident Engineer: | Amir Pakyari |
Construction Contract Value: | $9,358,798.00 |
Construction Bid Price: | $8,147,999.00 |
Initial Construction Estimate: | $7,708,416.00 |
District: | District 4 |
|
Bridges |
|
|
|
|