DISTRICT 5- DISTRICT 6- ITS CONSTRUCTION ON ROUTE 3, FROM BRAINTREE TO PLYMOUTH
The work under this contract consists of installing twenty six (26) Closed Circuit Television Cameras (CCTV) and seven (7) Variable Message Signs (VMS) along Route 3 South in Southeastern Massachusetts. It encompasses approximately 40 miles of the corridor from Exit 19 in Braintree to Exit 2 in Plymouth. All field devices will communicate to the MassDOT Highway Operations Center (HOC) located in South Boston through cellular modems and will be integrated into the existing software platforms at the HOC.
Location:
Construction Begins: Winter 2016/2017
Resident Engineer: Misael Sanchez
Construction Bid Price: $4,394,730.00
District: District 5

Contracts (1) Progress
# 97765 -- Construction Contract
Installation of an Intelligent Transportation System (ITS) (26 Closed Circuit Television Cameras (CCTV) and 6 Variable Message Signs (VMS)) along Route 3 (Pilgrims Highway). Completed

Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 02/17/2017
    Contract Information
    Project Designer: Consultant
    Funding Source: CONGESTION MIT. AIR QUAL.
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 04/02/2013
    Project Initiation Form PIF Received 06/18/2016
    Project Initiation Form PIF Entered 09/28/2015
    Project Initiation Form PRC Submitted 09/30/2015
    Project Review Committee PRC Approved 01/25/2016
    Project Status Advertised 09/10/2016
    Project Management
    100% Design 100% Package Received 06/13/2016
    100% Design 100% Package Comments to DE 07/19/2016
    100% Design 100% Plans Approved 07/25/2016
    100% Design 100% Plans Complete 07/25/2016
    25% Design 25% Package Received 04/04/2016
    75% Design 75% Package Received 04/04/2016
    75% Design 75% Package Comments to DE 05/06/2016
    75% Design 75% Plans Approved 05/09/2016
    75% Design 75% Plans Complete 05/06/2016
    Final Design PS&E Received 08/15/2016
    Final Design Peer Review Comments to DE 08/26/2016
    Final Design PS&E to FAPRO 09/01/2016