Project Description: |
BOSTON- MILTON- SYSTEMATIC MAINTENANCE & STRUCTURAL REPAIRS TO 7 BRIDGES ALONG THE I-93/ US 1/ST 3
Bridge Cleaning, Deck Joint Repairs, Reinforced Concrete Excavation, Epoxy Coating of Substructure Surfaces, Concrete Repairs, and Steel Cleaning and Painting of Two Bridges.
|
Location: |
|
Resident Engineer: | Carmine LaVita |
Construction Contract Value: | $2,629,996.50 |
Construction Bid Price: | $1,881,815.00 |
Initial Construction Estimate: | $1,507,000.00 |
District: | District 6 |
|