| Project Description: |
DISTRICT 2 - SYSTEMATIC BRIDGE MAINTENANCE AT VARIOUS LOCATIONS
Bridge cleaning and repair at various locations along Interstates 91 and 391.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | M. Ali Jalinous![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||