| Project Description: |
BELCHERTOWN- WARREN- BRIDGE DEMOLITION OF B-05-023, WILSON STREET OVER NECRR, & W-07-012, OLD BOSTON POST ROAD OVER NAULTAUG BROOK
Existing single lane Timber Bridge Structure over the NECRR. Existing bridge is presently closed with a detour around the bridge.
|
| Location: |
|
| Construction Begins: | Winter 2016/2017 |
| Resident Engineer: | David Virgilio![]() |
| Construction Bid Price: | $522,599.66 |
| District: | District 2 |
|
Bridges
|
||||||||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||