| Project Description: |
BELCHERTOWN- WARREN- BRIDGE DEMOLITION OF B-05-023, WILSON STREET OVER NECRR, & W-07-012, OLD BOSTON POST ROAD OVER NAULTAUG BROOK
Existing single lane Timber Bridge Structure over the NECRR. Existing bridge is presently closed with a detour around the bridge.
|
| Location: |
|
| Project Manager: | James Dalton![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||