Project Description: |
BELCHERTOWN- WARREN- BRIDGE DEMOLITION OF B-05-023, WILSON STREET OVER NECRR, & W-07-012, OLD BOSTON POST ROAD OVER NAULTAUG BROOK
Existing single lane Timber Bridge Structure over the NECRR. Existing bridge is presently closed with a detour around the bridge.
|
Location: |
|
Construction Begins: | Winter 2016/2017 |
Resident Engineer: | David Virgilio |
Construction Bid Price: | $522,599.66 |
District: | District 2 |
|
Bridges
|
|
|
|
|