| Project Description: |
ORANGE- BRIDGE REPLACEMENT, O-03-009, HOLTSHIRE ROAD OVER MILLERS RIVER
Existing 3-span steel beam with reinforced concrete deck superstructure. Superstructure sits on concrete piers and abutments. Concrete reveal and curbing with steel pipe railings on both sides of the bridge.
|
| Location: |
|
| Construction Begins: | Spring 2018 |
| Resident Engineer: | John Burek![]() |
| Construction Bid Price: | $4,661,586.50 |
| District: | District 2 |
|
Bridges
|
||||||||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||