Project Description: |
ORANGE- BRIDGE REPLACEMENT, O-03-009, HOLTSHIRE ROAD OVER MILLERS RIVER
Existing 3-span steel beam with reinforced concrete deck superstructure. Superstructure sits on concrete piers and abutments. Concrete reveal and curbing with steel pipe railings on both sides of the bridge.
|
Location: |
|
Construction Begins: | Spring 2018 |
Resident Engineer: | John Burek |
Construction Bid Price: | $4,661,586.50 |