Project Description: |
AMHERST- BRIDGE REPLACEMENT, A-08-008, MILL STREET OVER MILL RIVER
Existing single span steel beam with corrugated metal deck surface superstructure. Combined concrete and stone masonry abutments and wingwalls. Steel post bridge railing with timber rails.
|
Location: |
|
Construction Begins: | Spring 2018 |
Resident Engineer: | Joseph Burek |
Construction Bid Price: | $2,161,066.00 |
District: | District 2 |
|
Bridges
|
|
|
|
|