| Project Description: |
WINCHENDON- BRIDGE REPLACEMENT, W-39-015, NORTH ROYALSTON ROAD OVER TARBELL BROOK
Existing single span steel beam with corrugated metal deck superstructure. Superstructure rests on concrete abutments. Bridge railing consist of two W-beam sections attached to metal posts.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | Municipality |
| Project Manager: | James Dalton![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||