| Project Description: |
WINCHENDON- BRIDGE REPLACEMENT, W-39-015, NORTH ROYALSTON ROAD OVER TARBELL BROOK
Existing single span steel beam with corrugated metal deck superstructure. Superstructure rests on concrete abutments. Bridge railing consist of two W-beam sections attached to metal posts.
|
| Location: |
|
| Construction Begins: | Autumn 2017 |
| Resident Engineer: | Colby Roussel![]() |
| Construction Bid Price: | $1,737,678.50 |
| District: | District 2 |
|
Bridges
|
||||||||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||