FALL RIVER- BRIDGE DECK REPLACEMENT. F-02-040, AIRPORT ROAD OVER STATE ROUTE 24
The proposed work for this project shall include a deck replacement, cleaning and painting of the steel members, and replacement of the existing bridge railing to a current standard rail. The superstructure shall have a curb-to-curb roadway width of 38 feet (two 14 foot lanes with two 5 foot shoulders), one 6.5 foot sidewalk (includes the curb width) on the north side, and one 19½ inch safety curb. The out-to-out deck width shall be 47.5 feet. The vertical underclearance should not be reduced. The proposed composite High Performance (HP) concrete deck shall be a minimum of 8 inches thick with 3 inches of superpave (HMA) wearing surface. The superstructure shall provide a utility bay to accommodate all existing utilities including replacement of the 8? diameter water pipe with a 12? diameter water line which the City of Fall River requested. Bridge railing consideration alternatives for this structure shall include S3-TL4 with Type I protective screen over the highway. The District requests that the stone be recapped on the existing wingwalls if possible.
Location:
  • City of Fall River
  • Construction Begins: Spring 2017
    Resident Engineer: Rajat Gogoi
    Construction Bid Price: $3,764,477.00
    District: District 5

    Contracts (2) Progress
    # 77886 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 97784 -- Construction Contract
    Bridge Deck Replacement (Including Painting) Br. No. F-02-040 (Concrete) Airport Road over Route 24. Completed

    Bridges

    Contract Dates
    Notice to Proceed: 04/26/2017
    Contract Information
    Project Designer: Consultant
    Funding Source: BRR OFF SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 05/15/2013
    Project Initiation Form PIF Entered 07/18/2013
    Project Initiation Form PRC Submitted 07/19/2013
    Project Review Committee PRC Approved 07/25/2013
    Project Status Advertised 09/10/2016
    Project Management
    100% Design 100% Package Received 07/29/2016
    25% Design 25% Package Received 01/14/2016
    25% Design 25% Package Comments to DE 02/22/2016
    25% Design Design Public Hearing 07/07/2016
    75% Design 75% Package Received 07/29/2016
    Final Design PS&E Received 08/30/2016
    Final Design PS&E to FAPRO 09/02/2016
    Final Design PS&E Received - Resub 1 11/18/2016