Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
FALL RIVER- BRIDGE DECK REPLACEMENT. F-02-040, AIRPORT ROAD OVER STATE ROUTE 24
The proposed work for this project shall include a deck replacement, cleaning and painting of the steel members, and replacement of the existing bridge railing to a current standard rail. The superstructure shall have a curb-to-curb roadway width of 38 feet (two 14 foot lanes with two 5 foot shoulders), one 6.5 foot sidewalk (includes the curb width) on the north side, and one 19½ inch safety curb. The out-to-out deck width shall be 47.5 feet. The vertical underclearance should not be reduced. The proposed composite High Performance (HP) concrete deck shall be a minimum of 8 inches thick with 3 inches of superpave (HMA) wearing surface. The superstructure shall provide a utility bay to accommodate all existing utilities including replacement of the 8? diameter water pipe with a 12? diameter water line which the City of Fall River requested. Bridge railing consideration alternatives for this structure shall include S3-TL4 with Type I protective screen over the highway. The District requests that the stone be recapped on the existing wingwalls if possible.
Location:
  • City of Fall River
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Harry Adolphe
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • F02040 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project