Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
HAVERHILL- RECONSTRUCTION ON ROUTE 97 (BROADWAY), FROM SILVER BIRCH LANE TO RESEARCH DRIVE
The project will widen the roadway to provide two 11 foot lanes with 5 foot striped shoulders to accommodate bicycles. Sidewalks will be installed on both sides of the roadway. The intersections of Route 97 at Lake Street and at Forest Street will be reconstructed to provide better alignment, turn lanes and crosswalks. Drainage improvements will be included for the entire project length, approximately 0.94 miles.
Location:
  • City of Haverhill
  • Construction Begins: Winter 2017/2018
    Resident Engineer: Carmen Ilardi
    Construction Bid Price: $5,269,069.69
    District: District 4

    Contracts (1) Progress
    # 100440 -- Construction Contract
    Roadway Reconstruction and Related Work (Including Signals) along a Section of Route 97 (Broadway). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 02/09/2018
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 06/24/2013
    Project Initiation Form PIF Entered 06/26/2013
    Project Initiation Form PRC Submitted 07/03/2013
    Project Review Committee PRC Approved 07/25/2013
    Project Status Advertised 05/13/2017
    Project Management
    100% Design 100% Package Received 01/26/2017
    100% Design 100% Package Comments to DE 03/01/2017
    25% Design 25% Package Received 05/29/2015
    25% Design 25% Package Comments to DE 03/25/2016
    25% Design Design Public Hearing 04/07/2016
    75% Design 75% Package Received 07/27/2016
    75% Design 75% Package Comments to DE 10/26/2016
    Final Design PS&E Received 03/28/2017
    Final Design PS&E to Peer Reviewer 03/29/2017
    Final Design Peer Review Comments to DE 04/14/2017
    Final Design PS&E to FAPRO 04/14/2017