Project Description: |
FRAMINGHAM- NATICK- STOCKBRIDGE- WAYLAND- WEST STOCKBRIDGE- SOLAR PHOTOVOLTAIC DEVELOPMENT LEASING AT VARIOUS SITES ALONG I-90
This is a developer-lease opportunity for underutilized surplussed parcels to be developed with solar electric generating stations under 20-year lease with no construction costs outlaid by MassDOT.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Anthony Duros |
Estimated Total Contract Cost: | $2.15 |
Estimated Total Federal Participating Construction Cost: | N/A |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|