Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
BUCKLAND- RECONSTRUCTION AND BICYCLE ACCOMMODATION ON ROUTE 112
The purpose of this project is to provide bicycle and pedestrian accommodation throughout this section of Route 112 (Ashfield Road) in the town of Buckland, MA, as well as upgrading conditions of problematic drainage and adjusting a vertical curve and its site distance to better meet standards. Based on Engineering Directive E-20-001 this project is exempt from Transit, Ramp, Design Loading, and Vertical Clearance Controlling Criteria. This project will have to comply with and supply supplemental documentation for Pedestrian and Bicycle Facilities and FHWA Controlling Criteria.
Location:
  • Town of Buckland
  • Design Responsibility: In-House Boston
    Right of Way Responsibility: MassDOT
    Project Manager: Koby J Lemrise
    Estimated Total Federal Participating Construction Cost: N/A
    Funding Provision: This project is planned to be funded through the 2028 Transportation Improvement Program for the Franklin Regional Council of Governments.
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Planned Federal FY: 2028
    Responsible MPO: Franklin Regional Council of Governments
    Location: Municipality
    Cities: BUCKLAND
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Project is AC'd in FFY 2028 and FFY 2029. MPO TEC Score 29/100. Project will be re-scored with revised scope.
  • Category FA - Congestion Mitigation/Air Quality (CMAQ)
    Federal Cost: $3,595,500.00
    State Cost: $898,875.00
    Total Cost: $4,494,375.00

    Planned Federal FY: 2029
    Responsible MPO: Franklin Regional Council of Governments
    Location: Municipality
    Cities: BUCKLAND
    Category: Advertised Projects Constr.
    Budget Section: 1A
    Advance Construct: No
    Air Quality Exempt: No

  • Project is AC'd in FFY 2028 and FFY 2029. MPO TEC Score 29/100. Project will be re-scored with revised scope.
  • Category FA - Congestion Mitigation/Air Quality (CMAQ)
    Federal Cost: $2,542,100.00
    State Cost: $635,525.00
    Total Cost: $3,177,625.00