Project Description: |
BURLINGTON- REMEDIATION & RELATED WORK AT ROUTE 3 & ROUTE 128 OFF WHEELER ROAD
Work consists of excavating, consolidating, and installing a final cover system for soil impacted by low levels of metals; removing, stabilizing, and disposing of soil impacted by higher levels of metals; and incidental work including clearing and grubbing, traffic management, and erosion control measures.
|
Location: |
|
Resident Engineer: | Brian Keating |
Construction Contract Value: | $554,913.00 |
Construction Bid Price: | $446,881.82 |
Initial Construction Estimate: | $415,920.00 |
District: | District 4 |
|
Bridges |
|
|
|
|