ATHOL- PHILLIPSTON- RESURFACING & RELATED WORK ON ROUTE 2A, FROM ROUTE 32 TO ROUTES 2/202 (MM 36.7 - MM 40.7: 4 MILES)
Work for the Route 2A resurfacing project in Athol-Phillipston will consist of milling the existing paved surface and resurfacing with hot mix asphalt pavement. Work will also include replacing signs and guardrail as needed, repairing hot mix asphalt berm, and new pavement markings. The project limits are as follows: Route 2A from Route 32 (Petersham Road) in Athol, MM 36.7, to Route 2 at Interchange 19 in Phillipston, MM 40.7 for a project length of 4.0 miles.
Location:
  • Town of Athol
  • Town of Phillipston
  • Resident Engineer: Matthew Minihan
    Construction Contract Value: $2,352,856.00
    Construction Bid Price: $2,000,223.20
    Initial Construction Estimate: $2,147,004.00
    District: District 2

    Contracts (1) Progress
    # 81873 -- Construction Contract
    Resurfacing and Related Work along Sections of Route 2A (Templeton and State Roads). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 10/09/2014
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/14/2013
    Project Initiation Form PIF Entered 08/20/2013
    Project Initiation Form PRC Submitted 08/20/2013
    Project Review Committee PRC Approved 08/26/2013
    Project Status Advertised 05/03/2014
    Project Management
    100% Design 100% Package Received 02/03/2014
    25% Design 25% Package Received 11/21/2013
    75% Design 75% Package Received 11/21/2013
    Final Design PS&E Received 02/03/2014
    Final Design PS&E to FAPRO 04/25/2014