| Project Description: |
DISTRICT 4- SCHEDULED & EMERGENCY SUBSTRUCTURE REPAIRS AT VARIOUS LOCATIONS
This contract is always required to repair the substructure elements of all bridges in District 4 to insure structural integrity of the substructure and to insure public safety from the spalling concrete due to age and freeze/thaw cycle.
|
| Location: | |
| Resident Engineer: | Joseph Breen![]() |
| Construction Contract Value: | $4,000,970.00 |
| Construction Bid Price: | $3,585,870.00 |
| Initial Construction Estimate: | $3,629,700.00 |
| District: | District 4 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||