Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
HAVERHILL- PEABODY- BRIDGE STEEL PAINTING AND REPAIRS OF SUBSTRUCTURE ELEMENTS, H-12-057 (2RR & 2RT) & P-03-037 (31T)
Haverhill - Structural steel beams and steel diaphragms of these two bridges require painting to enhance the life of the structure. Extensive repairs were done to steel beams and the concrete deck was removed and replaced by a new concrete deck. FHWA during District 4 inspection pointed out that these bridges should be painted to increase the useful life of these structures. Peabody - Heavy scaling on steel beams has become a safety issue as big chunks of scaling have fallen down on the moving traffic. We must paint this bridge over I-95 to make the travelling people safe and to increase the life of the structure.
Location:
  • City of Haverhill
  • City of Peabody
  • Resident Engineer: Lokman Arran
    Construction Contract Value: $2,484,436.19
    Construction Bid Price: $2,137,970.00
    Initial Construction Estimate: $2,083,000.00
    District: District 4

    Contracts (1) Progress
    # 85016 -- Construction Contract
    Cleaning, Painting and Substructure Repairs of 2 Bridges Br. Nos. H-12-057 & P-03-037 (Steel) Route 125 (Industrial Avenue) over Old Ferry Road & MBTA Railroad and Forest Stre Completed

    Bridges

    Contract Dates
    Notice to Proceed: 07/24/2015
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 08/16/2013
    Project Initiation Form PIF Entered 08/16/2013
    Project Initiation Form PRC Submitted 08/16/2013
    Project Review Committee PRC Approved 08/19/2013
    Project Status Advertised 09/20/2014
    Project Management
    100% Design 100% Package Received 11/14/2013
    Final Design PS&E Received 12/03/2013
    Final Design PS&E Received 09/12/2014
    Final Design PS&E Received 12/04/2014
    Final Design PS&E to FAPRO 12/18/2013
    Final Design PS&E to FAPRO 09/17/2014
    Final Design PS&E to FAPRO 12/05/2014