Project Description: |
BRAINTREE- BRIDGE REPLACEMENT, B-21-017, WASHINGTON STREET (ST 37) OVER MBTA/CSX RAILROAD
Work consists of replacing B-21-017.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Winter 2026/2027 |
Project Manager: | Christopher I Cameron![]() |
Estimated Total Contract Cost: | $26,255,874.35 |
Estimated Total Federal Participating Construction Cost: | $27,466,121.66 |
Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Boston Metropolitan Planning Organization. |
District: | District 6 |
Current Status: | 25% Package Received (as of 03/14/2025 ) |
|