| Project Description: |
CHICOPEE- LUDLOW- WILBRAHAM- RESURFACING & RELATED WORK ON I-90 (MM 50.0 - 59.0)
Work under this project will consist of resurfacing I-90 from MM 50.0 to MM 59.0. Also included will be drainage structure adjustments and curb/berm replacement and guardrail upgrades as required.
|
| Location: |
|
| Construction Begins: | Summer 2023 |
| Resident Engineer: | David Hazel![]() |
| Construction Bid Price: | $38,691,846.25 |
| District: | District 2 |
|