CHICOPEE- LUDLOW- WILBRAHAM- RESURFACING & RELATED WORK ON I-90 (MM 50.0 - 59.0)
Work under this project will consist of resurfacing I-90 from MM 50.0 to MM 59.0. Also included will be drainage structure adjustments and curb/berm replacement and guardrail upgrades as required.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Hector Tineo![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||