Project Description: |
CHICOPEE- FACILITY REPAIRS AT CHICOPEE MAINTENANCE BUILDING ALONG I-90
Project will include replacement of windows, doors, and roof, along with adding 2 bays to the mechanics' garage to better facilitate the larger vehicles in the current snow fighting fleet.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Construction Begins: | Autumn 2026 |
Project Manager: | Edmond Libsch |
Estimated Total Contract Cost: | $1,324,300.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 2 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|