| Project Description: |
DISTRICT 4- HIGHWAY LIGHTING BRANCH CIRCUIT RE-CABLING, FROM SIX (6) LIGHTING LOAD CENTERS ALONG ROUTE I-95 (128), FROM LEXINGTON TO WOBURN
HIGHWAY LIGHTING BRANCH CIRCUIT RE-CABLING FROM SIX (6) LIGHTING LOAD CENTERS ALONG ROUTE I-95 (128) LEXINGTON-WOBURN TO THE BASE OF ALL POLES, REPLACING ANY DAMAGED CONDUIT, USING COLOR CODED WIRES AND TAGGING ALL CIRCUITS.
|
| Location: | |
| Resident Engineer: | Peter Gfatter![]() |
| Construction Contract Value: | $1,946,980.75 |
| Construction Bid Price: | $1,285,982.50 |
| Initial Construction Estimate: | $1,341,000.00 |
| District: | District 4 |
|