Project Description:
WESTBOROUGH- SOUTHBOROUGH- RECONSTRUCTION OF I-495 AT ROUTE 9 INTERCHANGE, INCLUDING BRIDGE REPLACEMENT (W-24-020 & W-24-021), BRAIDED RAMP CONSTRUCTION AND ROUTE 9 IMPROVEMENTS
The proposed improvements involves replacement of the I-495 NB and SB bridges and construction of a braided ramp system, including construction of four new ramp bridges. Route 9 improvements extend from the Computer Drive/Research Drive intersection to the Crystal Pond Road intersection. Improvements include widening Route 9 as required, adding an auxiliary lane on Route 9 WB between I-495 SB and Computer Drive, reconfiguration and reconstruction of the Route 9/Crystal Pond Road intersection, and limited improvements to intersections along Research Drive and Computer Drive. Other improvements include bicycle and pedestrian improvements as feasible.
Location:
  • Town of Southborough
  • Town of Westborough
  • Design Responsibility: Consultant
    Project Manager: Lyris Liautaud
    Estimated Total Contract Cost: $38,500,000.00
    Estimated Total Federal Participating Construction Cost: $40,250,000.00
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/23/2013
    Project Initiation Form PIF Entered 09/23/2013
    Project Initiation Form PRC Submitted 09/23/2013
    Project Review Committee PRC Approved 10/01/2013
    Project Management