Project Description: |
SALISBURY- RECONSTRUCTION & RELATED WORK ON ROUTE 1A (NORTH END BOULEVARD)
Work consists of roadway and sidewalk reconstruction on Route 1A (North End Boulevard) starting at the Route 1 intersection going east then north to the New Hampshire state line.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Eric I Nova |
Estimated Total Contract Cost: | $2,300,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|